• Mining
Wednesday, June 10, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Mining

Kendrick targets world-class rare earth mine with new Teufelskuppe drilling results

by reporter
May 15, 2026
in Mining
1.8k 56
A A
0
Cluster of metallic cubic pyrite crystals on a rocky matrix with shiny, reflective facets against a dark background.
 

Kendrick Resources says new drilling results from its Teufelskuppe project have strengthened the potential for developing one of Namibia’s most significant rare earth mines, as the company accelerates work towards a maiden mineral resource estimate.

The company reported that a new 112-metre diamond drill hole at Teufelskuppe returned a weighted average grade of 3.03% total rare earth oxides (TREO), including more than 17 metres grading above 4%.

One section between 42 and 46 metres recorded a peak grade of 10.47% TREO, while a 7.25-metre interval returned 5.1%, highlighting strong mineralisation at depth.

“This is further verification that the very large surface expressions of the TK carbonatite contain similar grades, supporting our prognosis of continuity throughout the TK complex. It is important to note that the above-surface tonnage estimated for TK is very close to that of the Mt Pass deposit, whilst Kendrick has yet to include any tonnage estimate for sub-surface mineralisation at TK and has taken no account of the Kieshöhe tonnage potential,” said company Chairman Colin Bird.

The company said the latest drilling complements surface sampling across seven carbonatite bodies in the Teufelskuppe complex, where 295 samples averaged 3.12% TREO.

The highest surface reading reached 4.79%, supporting the company’s assessment of a large, high-grade deposit with strong continuity between surface and subsurface mineralisation.

Kendrick holds a 70% earn-in interest in the project through an agreement with Bonya Exploration and is planning a major 13,200-metre drilling campaign at Teufelskuppe to determine the extent of mineralisation below the surface.

A separate 10,500-metre drilling campaign is also underway at the nearby Kieshöhe target.

Kendrick said the project’s economics are supported by the composition of the rare earth basket, with neodymium and praseodymium accounting for around 25% of the resource.

The two elements are in high demand for the manufacture of permanent magnets used in electric vehicles, wind turbines, defence systems and advanced electronics.

The company is also conducting metallurgical studies, beneficiation testing and infrastructure planning, including assessments of transport routes and a central processing facility that could serve both Teufelskuppe and Kieshöhe.

Kendrick aims to complete a maiden JORC-compliant resource estimate and preliminary economic assessment before moving towards a mining decision.

“Our prognosis that this is a potential top-tier world-class project is being justified with every technical step we take. The commissioning of a reverse circulation drilling programme will significantly accelerate the programme and confirm our expectations, as will continued surface trenching and sampling. We will keep the market informed as we receive results on a regular basis,” Bird said.

author avatar
reporter
See Full Bio
Share396Tweet247

Related Posts

Over N$3.5 billion spent on skills and CSR by Namibian mining sector
Mining

Mining exports fall N$2.7bn as uranium shipments decline

  Namibia's mining and quarrying sector recorded a N$2.7 billion decline in export earnings in April 2026 compared to the...

June 9, 2026
Andrada Mining secures N$838m partnership to advance Brandberg West
Mining

Andrada reports lithium grades of up to 3.46% at Lithium Ridge

Andrada Mining has reported another set of high-grade lithium drill results from its Lithium Ridge project in Namibia, with assays...

June 9, 2026

Recommended

Govt forecasts N$4bn revenues from Green Hydrogen

Govt forecasts N$4bn revenues from Green Hydrogen

4 years ago
NAMCOR appoints internal executive as Acting Managing Director

Namcor still targeting shift to operator status within a decade

1 month ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.