• Mining
Wednesday, June 17, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Diamonds

What you need to know about Debmarine’s Benguela Gem vessel

by editor
March 20, 2022
in Diamonds, Mining
1.8k 56
A A
0

The vessel was previously known as Additional Mining Vessel (AMV#3) and re-christened Benguela Gem.

  • The vessel is the world’s largest diamond recovery vessel designed in Norway and Poland, built in Romania by Damen Shipyards Mangalia and equipped by De Beers Marine South Africa in Cape Town.
  • The vessel cost US$420 million (N$7 billion) to custom-build through co-funding from five banks, namely Nedbank, RMB, Standard Bank, Bank Windhoek and ABSA, with Debmarine Namibia covering 25% of the total project cost.
  • This translated into N$5.6 billion provided by the banks, representing 75% of the cost of the vessel and Debmarine Namibia financing the remaining N$1.4 billion.
  • The 177 metres long vessel, will use state-of-the-art technology to optimise ocean floor diamond recovery, through sub-sea crawling extraction techniques to retrieve diamonds from the seabed, which will then be processed on board. Diamond recovery by Debmarine Namibia takes place at 90 to 150 metres below sea level.
  • The vessel is the new flagship and the seventh ship in Debmarine Namibia’s fleet and its recovery equipment was built in parallel with the vessel construction.
  • The vessel is expected to operate for at least 30 years.
  • When it commences commercial operations next week, Benguela Gem is expected to increase Debmarine Namibia’s production by about 500 000 carats, boosting its annual production by 35%.
  • The diamond recovery vessel is anticipated to contribute approximately N$2 billion in taxes and royalties per annum in addition to more than 160 jobs.
author avatar
editor
See Full Bio
Share398Tweet249

Related Posts

Male presenter in a suit speaks at a clear podium on a lit stage; sign reads '2026 IES' and 'New Orleans' in the foreground.
Mining

Shakwa Nyambe hands over leadership of global energy negotiators association

  Namibian energy executive Shakwa Nyambe has stepped down as President of the Association of International Energy Negotiators (AIEN) after...

June 17, 2026
Namibia map highlighting Kaoko Metals projects: Chalkos Cu/Ag near Sesfontain and Karibib Cu/Au/WO3 near Walvis Bay, with Atlantic Ocean to the west.
Mining

Kaoko Metals moves closer to maiden drilling at Karibib Project

  Kaoko Metals is advancing exploration activities at its Karibib Project in central Namibia as it moves closer to launching...

June 16, 2026

Recommended

First-ever on-rig blowout preventer assembly achieved on Deepsea Mira in Namibia

First-ever on-rig blowout preventer assembly achieved on Deepsea Mira in Namibia

10 months ago
Bannerman switches Etango uranium project to live power

Etango uranium project early works employ over 560 as construction advances

3 months ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.