• Mining
Friday, August 21, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Diamonds

What you need to know about Debmarine’s Benguela Gem vessel

by editor
March 20, 2022
in Diamonds, Mining
1.8k 56
A A
0

The vessel was previously known as Additional Mining Vessel (AMV#3) and re-christened Benguela Gem.

  • The vessel is the world’s largest diamond recovery vessel designed in Norway and Poland, built in Romania by Damen Shipyards Mangalia and equipped by De Beers Marine South Africa in Cape Town.
  • The vessel cost US$420 million (N$7 billion) to custom-build through co-funding from five banks, namely Nedbank, RMB, Standard Bank, Bank Windhoek and ABSA, with Debmarine Namibia covering 25% of the total project cost.
  • This translated into N$5.6 billion provided by the banks, representing 75% of the cost of the vessel and Debmarine Namibia financing the remaining N$1.4 billion.
  • The 177 metres long vessel, will use state-of-the-art technology to optimise ocean floor diamond recovery, through sub-sea crawling extraction techniques to retrieve diamonds from the seabed, which will then be processed on board. Diamond recovery by Debmarine Namibia takes place at 90 to 150 metres below sea level.
  • The vessel is the new flagship and the seventh ship in Debmarine Namibia’s fleet and its recovery equipment was built in parallel with the vessel construction.
  • The vessel is expected to operate for at least 30 years.
  • When it commences commercial operations next week, Benguela Gem is expected to increase Debmarine Namibia’s production by about 500 000 carats, boosting its annual production by 35%.
  • The diamond recovery vessel is anticipated to contribute approximately N$2 billion in taxes and royalties per annum in addition to more than 160 jobs.
author avatar
editor
See Full Bio
Share399Tweet250

Related Posts

Namibia’s mining exports reach N$5.3bn in July, driven by uranium and diamonds
Mining

Mining price surge drives Namibia’s producer inflation to 50.7%

  Namibia’s mining sector has emerged as the main driver of a sharp rise in producer inflation, with mining and...

August 21, 2026
Solar Revolving Fund finances 5,800 renewable energy systems worth N$177m
Mining

Namibia has no 51% local ownership policy for new mines

    Namibia has not adopted a policy or law requiring 51% local ownership in new mining ventures, Deputy Minister...

August 15, 2026

Recommended

Namibia competition watchdog flags supply and competition risks in Nasan–Vivo/Engen deal

Namibia competition watchdog flags supply and competition risks in Nasan–Vivo/Engen deal

6 months ago
Namibia has enough uranium to meet energy needs – Tweya

Namibia has enough uranium to meet energy needs – Tweya

3 years ago
Load More
Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.