No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home
Uranium

Pioneer advances exploration at Warmbad Uranium Project

by reporter
October 6, 2025
in Uranium
Reading Time: 2 mins read
1.7k 130
A A

Pioneer Lithium is pressing ahead with exploration plans at its Warmbad Uranium Project in southern Namibia, with drilling scheduled to start in the first half of 2026 following strong backing from local authorities and landowners.

According to the company, next year’s exploration programme will include drone-based radiometric and magnetic surveys, detailed geophysical interpretation to map key geological structures, and step-out drilling aimed at expanding the known mineralised zones.

Pioneer recently carried out a ground reconnaissance visit to engage with local stakeholders, during which it received “strong support from the Warmbad and Karasburg authorities.”

The company confirmed that all regulatory approvals required to proceed with exploration have been submitted to the Ministry of Mines and Energy (MME), with access agreements discussed at a meeting held on 30 September 2025 between the ministry, landowners, and the resettlement committee.

“Regulatory approvals to conduct exploration have been submitted to the Namibian Ministry of Mines and a meeting between the Namibian MME, the resettlement committee, landowners and Pioneer occurred on the 30th of September 2025. Access approvals are expected to be forthcoming,” the company said.

After acquiring the Warmbad Project, Pioneer reviewed and interpreted all available historical drilling data obtained from the MME.

This work supported the release of a JORC-compliant Exploration Target estimated between 22.2 and 32.1 million tonnes, grading 100 to 120 parts per million (ppm) U₃O₈. The identified mineralised zones remain open in several directions, suggesting scope for further expansion.

In a separate announcement, the company confirmed its withdrawal from the Gaobis Uranium Project to concentrate resources on advancing Warmbad and exploring other high-return opportunities that align with long-term shareholder value.

Located near the town of Warmbad in the //Karas Region, the project is an alaskite-hosted uranium system comparable in style and potential to Namibia’s world-class Rössing Mine.

It is underpinned by more than 30,000 metres of historical reverse circulation drilling carried out by Xemplar Energy between 2007 and 2009.

MUST READ

Tumas Uranium project nears full construction readiness

Deep Yellow delays Tumas uranium project over weak market conditions

November 22, 2026
5.8k
Row of large blue barrels labeled 'Low Specific Activity (LSA-1) UN 2912' in an industrial storage area, with safety barriers nearby.

Langer Heinrich generates N$5.16bn in uranium sales

November 17, 2026
5.8k
Map of the NOVA JV project area along the Namibian coast showing three labeled sites—Namaqua, Iguana, and Barking Gecko—with arrows pointing to each site and a shaded polygon marking the NOVA JV PROJECT AREA near Walvis Bay.

Core Energy Minerals begins drilling at Namibia’s Barking Gecko uranium prospect

November 12, 2026
5.8k
Tile showing Uranium (U, atomic number 92) beside a yellow uranium ore on a black reflective surface.

Namibia earns N$3.4 billion from uranium exports to China in September

November 10, 2026
5.8k
Industrial drilling rig captured from ground level, showing metal rails, gears and hydraulic components reaching toward the sky.

Arkle begins second-phase drilling at Namibia’s Onyofi uranium project

November 10, 2026
5.8k
Group of professionals in business attire gather outside a modern white building with the IAEA logo on the wall and a red carpet under a bright blue sky.

IAEA raises groundwater protection concerns over Namibia uranium pilot project

November 9, 2026
5.8k
Next Post
ReconAfrica targets November for Kavango West 1X total depth

ReconAfrica begins drilling into Otavi reservoir at Kavango West 1X

Somerschield invests N$12.9m in Monitor Exploration’s Namibian oil projects

Somerschield invests N$12.9m in Monitor Exploration’s Namibian oil projects

Recommended

TotalEnergies CEO in Namibia for talks with President

TotalEnergies CEO in Namibia for talks with President

Paladin Energy completes Langer Heinrich Mine restart project within N$2.2b budget 

Paladin Energy completes Langer Heinrich Mine restart project within N$2.2b budget 

Deep Yellow in N$2.7bn raise for Tumas project in Namibia

Deep Yellow in N$2.7bn raise for Tumas project in Namibia

Gold and uranium lift Namibia’s mining performance in October

Gold and uranium lift Namibia’s mining performance in October

Toyota eyes stake in Namibia’s green iron venture

Toyota eyes stake in Namibia’s green iron venture

ReconAfrica strikes deal to increase Kavango Basin stake

ReconAfrica strikes deal to increase Kavango Basin stake

Load More

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • Login
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.