No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home
Uranium

Paladin Energy reports N$1.4 billion revenue from Langer Heinrich Mine

by editor
February 26, 2025
in Uranium
Reading Time: 2 mins read
1.8k 38
A A

Paladin Energy has announced that the Langer Heinrich Mine (LHM) generated N$1.4 billion (US$77.2 million) in revenue between July and December 2024.

The mine, which resumed production in March 2024 after a period of care and maintenance, continues to ramp up operations.

During the six months ending December 31, 2024, LHM produced 1.3 million pounds (Mlb) of uranium oxide (U3O8). Paladin Energy allocated US$3 million toward the mine’s restart and paid US$5 million in interest on its debt facility.

Ore feed during this period was sourced from previously mined, medium-grade stockpiles, reducing the stockpile’s value from US$80.4 million to US$57.3 million. However, efforts to access higher-grade ore are underway, including contractor engagement for early mining commencement.

Paladin Energy’s half-year financial report highlighted strong liquidity, with US$165.8 million in unrestricted cash and short-term investments, along with an undrawn US$50 million revolving debt facility. The company has provided a total of US$659.1 million to Langer Heinrich Uranium (LHU), with US$576.2 million from Paladin and its wholly owned subsidiaries and US$82.9 million from CNOL. Repayment of shareholder loans remains contingent on LHU generating sufficient free cash flow.

Production expenditure at the mine totaled US$59.5 million for operations, while exploration expenditure amounted to US$14 million, covering minimum tenement commitments and transaction costs for the Fission project acquisition.

From a safety perspective, Paladin recorded no serious environmental or radiation incidents. However, one lost-time injury (LTI) was reported during the period, with a Total Recordable Injury Frequency Rate (TRIFR) of 4.1 per million hours worked over the past 12 months.

Operating cash flow stood at US$30.5 million, while free cash flow from operations (post-capital expenditure) was US$6.4 million. Unrestricted group cash, cash equivalents, and short-term investments surged by 239% to US$165.8 million.

The company is advancing its planning and recruitment efforts at LHM to support infill drilling in existing mining pits, exploration for resource extension on the existing mining lease (ML140), and target identification in the adjacent lease (ML172).

MUST READ

Row of large blue barrels labeled 'Low Specific Activity (LSA-1) UN 2912' in an industrial storage area, with safety barriers nearby.

Langer Heinrich generates N$5.16bn in uranium sales

November 17, 2026
5.8k
Map of the NOVA JV project area along the Namibian coast showing three labeled sites—Namaqua, Iguana, and Barking Gecko—with arrows pointing to each site and a shaded polygon marking the NOVA JV PROJECT AREA near Walvis Bay.

Core Energy Minerals begins drilling at Namibia’s Barking Gecko uranium prospect

November 12, 2026
5.8k
Tile showing Uranium (U, atomic number 92) beside a yellow uranium ore on a black reflective surface.

Namibia earns N$3.4 billion from uranium exports to China in September

November 10, 2026
5.8k
Industrial drilling rig captured from ground level, showing metal rails, gears and hydraulic components reaching toward the sky.

Arkle begins second-phase drilling at Namibia’s Onyofi uranium project

November 10, 2026
5.8k
Group of professionals in business attire gather outside a modern white building with the IAEA logo on the wall and a red carpet under a bright blue sky.

IAEA raises groundwater protection concerns over Namibia uranium pilot project

November 9, 2026
5.8k
Langer Heinrich Mine records 33% rise in uranium production

Langer Heinrich uranium mine generates N$1.52bn in quarterly revenue

November 6, 2026
5.8k
Next Post
Snow Lake Energy launches Phase 2 drilling at Engo Valley Uranium Project

Snow Lake Energy launches Phase 2 drilling at Engo Valley Uranium Project

BW Energy to drill appraisal well at Kharas Prospect in Q3 2025

BW Energy to drill appraisal well at Kharas Prospect in Q3 2025

Recommended

Prospect Resources finalises Omaruru project full ownership deal

Prospect Resources finalises Omaruru project full ownership deal

Halliburton expands its presence in Namibia with new operational bases

Halliburton expands its presence in Namibia with new operational bases

Namibia to honor existing mineral and petroleum deals, eyes future project stakes

Namibia to honor existing mineral and petroleum deals, eyes future project stakes

Huge fuel price increase for Namibia announced

Huge fuel price increase for Namibia announced

Germany commits to Namibia’s green hydrogen plans

Germany commits to Namibia’s green hydrogen plans

Andrada Mining’s Uis Mine achieves significant boost in lithium and tin resources

Andrada Mining’s Uis Mine achieves significant boost in lithium and tin resources

Load More

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • Login
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.