• Mining
Sunday, June 21, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Uranium

Paladin Energy reports N$1.4 billion revenue from Langer Heinrich Mine

by editor
February 26, 2025
in Uranium
1.8k 38
A A
0

Paladin Energy has announced that the Langer Heinrich Mine (LHM) generated N$1.4 billion (US$77.2 million) in revenue between July and December 2024.

The mine, which resumed production in March 2024 after a period of care and maintenance, continues to ramp up operations.

During the six months ending December 31, 2024, LHM produced 1.3 million pounds (Mlb) of uranium oxide (U3O8). Paladin Energy allocated US$3 million toward the mine’s restart and paid US$5 million in interest on its debt facility.

Ore feed during this period was sourced from previously mined, medium-grade stockpiles, reducing the stockpile’s value from US$80.4 million to US$57.3 million. However, efforts to access higher-grade ore are underway, including contractor engagement for early mining commencement.

Paladin Energy’s half-year financial report highlighted strong liquidity, with US$165.8 million in unrestricted cash and short-term investments, along with an undrawn US$50 million revolving debt facility. The company has provided a total of US$659.1 million to Langer Heinrich Uranium (LHU), with US$576.2 million from Paladin and its wholly owned subsidiaries and US$82.9 million from CNOL. Repayment of shareholder loans remains contingent on LHU generating sufficient free cash flow.

Production expenditure at the mine totaled US$59.5 million for operations, while exploration expenditure amounted to US$14 million, covering minimum tenement commitments and transaction costs for the Fission project acquisition.

From a safety perspective, Paladin recorded no serious environmental or radiation incidents. However, one lost-time injury (LTI) was reported during the period, with a Total Recordable Injury Frequency Rate (TRIFR) of 4.1 per million hours worked over the past 12 months.

Operating cash flow stood at US$30.5 million, while free cash flow from operations (post-capital expenditure) was US$6.4 million. Unrestricted group cash, cash equivalents, and short-term investments surged by 239% to US$165.8 million.

The company is advancing its planning and recruitment efforts at LHM to support infill drilling in existing mining pits, exploration for resource extension on the existing mining lease (ML140), and target identification in the adjacent lease (ML172).

author avatar
editor
See Full Bio
Share397Tweet248

Related Posts

Uranium exports rise 22.1% year-on-year in Q3
Uranium

Namibia’s new Nuclear Bill to drive uranium value addition and expand nuclear ambitions

  Namibia's proposed Nuclear Bill is set to place value addition at the centre of the country's uranium industry, marking...

June 11, 2026
Map of the Koppies Project showing EPL mining blocks and boundaries in green, with scale bar, north arrow, and nearby place labels (e.g., Namib IV EPL 7662, Hirabeb EPL 7278).
Uranium

Elevate Uranium expands Marenica Resource by 31% to 52.8 million pounds

  Elevate Uranium Limited has announced a 31% increase in the Mineral Resource Estimate for its flagship Marenica Uranium Project...

June 10, 2026

Recommended

Koryx Copper a Namibian success story

Koryx Copper a Namibian success story

5 months ago
The gold success story of Heye Daun 

The gold success story of Heye Daun 

2 years ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.