
Australian-listed Aldoro Resources Limited has commenced a 1,930-metre diamond drilling programme at its Copper Hill Project in central Namibia to test a potential large-scale copper-gold deposit spanning more than 2.5 kilometres in diameter.
The company said the two-rig drilling campaign is targeting the Nordenberg prospect within Exclusive Prospecting Licence (EPL) 7895, approximately 20 kilometres north of Kalkfeld.
The programme involves two drillholes, CH001 measuring 1,280 metres and CH002 measuring 650 metres, which are being drilled simultaneously from opposite southern flanks of the target.
Aldoro said the drilling is designed to investigate the depth and lateral extent of an interpreted porphyry copper-gold system, including its outer alteration zone, contact zone and potential mineralised core.
Aldoro Executive Chairperson Quinn Li said the company was using its own drilling equipment to accelerate exploration and reduce costs associated with external contractors.
“By deploying two of our wholly owned diamond rigs to drill two converging low-dip holes simultaneously, we are halving the time required to test the central core of this system while operating at a fraction of conventional third-party contractor costs,” Li said.
The company has deployed its Diamec Smart 8 automated diamond core rig to drill CH001, while its Nock 800 rig is being used for CH002.
The drilling programme is being supervised by a specialist engineer from equipment manufacturer Epiroc.
According to Aldoro, previous geological and geophysical surveys identified a concentric magnetic anomaly associated with a multi-element soil geochemical anomaly extending more than 2.5 kilometres in diameter.
The magnetic anomaly remained visible after 200 metres of upward continuation, which the company said supports its interpretation of a potentially large intrusive body beneath the prospect.
Geochemical sampling identified copper concentrations exceeding 30 parts per million at the centre of the anomaly, surrounded by molybdenum concentrations above eight parts per million and potassium levels of approximately 2%.
Aldoro is also processing data from an intermediate-gradient induced polarisation survey conducted across the Nordenberg target to identify subsurface structures and potential sulphide mineralisation.
The results are expected to provide additional geological information to guide exploration alongside the ongoing drilling programme.
The Copper Hill Project is located approximately 20 kilometres from Aldoro’s flagship Kameelburg project, where the company is undertaking niobium drilling and advancing mineral processing work.
Aldoro said the proximity of the two projects would allow it to share exploration infrastructure, technical personnel and company-owned drilling equipment, reducing operational costs.
The company has not yet reported drilling results from the Nordenberg programme, and the presence of an economically viable copper-gold deposit remains unconfirmed.











