No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home
Gold

Wia Gold unveils new high-grade deep target at Kokoseb

by reporter
June 15, 2026
in Gold
Reading Time: 2 mins read
1.8k 19
A A
991
SHARES
5.8k
VIEWS
Share on Facebook
Share on Twitter
 

Wia Gold Limited (ASX: WIA) has intercepted a major new high-grade gold zone deep beneath its 2.93-million-ounce Kokoseb Gold Project in north-western Namibia, boosting the project’s long-term underground mining potential.

The discovery follows an extensive drilling campaign comprising nearly 20,000 metres across 39 drill holes.

The standout result came from diamond drill hole KDD147, which returned a high-grade intercept of 9.0 metres at 10.64 grams per tonne (g/t) gold from a depth of 811 metres.

Another deep hole in the same Central Zone, KDD137, intersected a broad mineralised zone of 54.1 metres at 1.25 g/t gold, including a higher-grade interval of 17.0 metres at 2.16 g/t gold.

The deep intercepts confirm thick, high-grade gold mineralisation located about 700 metres below surface and approximately 350 metres beneath the open-pit limits outlined in the company’s 2025 Scoping Study.

“The discovery of a new high-grade target beneath the Central Zone, together with the strong continuity demonstrated in the existing high-grade shoots in both the Central and Southern Zones, further strengthens Kokoseb’s underground potential. Mineralisation has been extended to 580 metres of strike below the Scoping Study pit shell, and both high-grade shoots remain open at depth,” said Wia Gold Managing Director and Chief Executive Officer, Henk Diederichs.

Beyond the new deep discovery, the latest drilling programme successfully extended existing high-grade plunging shoots in both the Central and Southern zones.

At the Central Zone, step-out drilling extended known mineralisation to 580 metres below the open-pit floor, while drilling at the Southern Zone extended the high-grade shoot by a further 80 metres to reach 480 metres below the scoping pit.

Six diamond drill rigs are currently operating at the project to continue defining underground resources. The new data will feed directly into an updated Mineral Resource Estimate (MRE).

Meanwhile, Wia Gold remains on track to complete its Definitive Feasibility Study (DFS) in the third quarter of 2026, a key milestone in advancing Kokoseb towards becoming one of Namibia’s next major gold mines.

“With six diamond rigs operating, we are continuing underground resource definition ahead of an updated MRE and the Definitive Feasibility Study in Q3 CY2026, with increasing confidence in the long-term scale and value of the deposit,” Diederichs said.

Related Posts

B2Gold’s Otjikoto Mine powered 79% by renewable energy

Otjikoto produces 70,000 ounces of gold in nine months

November 5, 2026
5.8k
Wia Gold secure N$341m to fund Kokoseb feasibility and expansion

NGX raises N$42m to accelerate gold and copper exploration in Namibia

November 1, 2026
5.8k
Construction worker wearing a neon yellow hard hat and safety vest at a building site with scaffolding in the background.

Navachab spends N$500m annually on fuel

October 25, 2026
5.8k
Rising gold prices lift Namibia’s mining revenues and project viability

Bank of Namibia acquires N$767.7m in gold under acquisition programme

September 25, 2026
5.8k
Map showing the Kokoseb Gold Project location in orange on a regional blue map with nearby towns labeled (Ondundu, Navachab, Twin Hills) and an Africa inset for context; includes a 0–100 km scale bar.

Wia weighs 33% processing capacity increase at Kokoseb to 7Mtpa

September 24, 2026
5.8k
Rising gold prices lift Namibia’s mining revenues and project viability

Navachab delivers over 300kg of gold to BoN, targets 600kg by year-end

September 21, 2026
5.8k

Recommended

Shell starts oil discovery appraisal in Namibia

Shell starts oil discovery appraisal in Namibia

4 years ago
5.8k
NamPower begins construction of N$630m line

NamPower begins construction of N$630m line

5 years ago
5.8k
Load More

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • Login
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.