• Mining
Sunday, May 17, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Mining

Over 130 Rössing staff opt for separation package after Beifang takeover 

by editor
June 25, 2024
in Mining
1.3k 39
A A
0

Rössing Uranium Limited has confirmed that as part of operational changes, approximately 138 employees have opted for the offered separation package.

Rössing Uranium Limited’s Managing Director Johan Coetzee says the total expense of separation packages is around N$90 million, which includes tax clearances and other related costs for those who have completed the process. 

“So far, approximately 138 employees have left under this package. The total expense of separation packages is around $90 million. This figure includes tax clearances and other related costs,” Coetzee told M&E on the sidelines of the company’s sustainability report launch recently.

This comes as Rössing Uranium last year awarded a N$12.8 billion mining contract to Chinese contractor Beifang Mining Services to take over responsibility for the operations. 

The mining contract agreement―spanning 13 years―will allow the company to secure the necessary resources and expertise to sustain and enhance Rössing Uranium’s mining operations.

As a consequence, the sub-contracting of mining operations will, however, see the uranium miner retrenching around 400 employees.

“This comes with a downfall as the company is set to let go all mining personnel, as a result, Rössing Uranium Limited has introduced a comprehensive workforce transition plan, offering attractive separation packages and employment support to its around 400 mining personnel,” Coetzee says.

According to Coetzee, employees were offered “a very lucrative separation package” with a three-and-a-half-year timeframe to find alternative jobs.

Coetzee said the decision was driven by the financial constraints faced by the company in funding a N$1.4 billion fleet upgrade investment required to continue operations.

The fleet upgrade would be required after the mining operations reached a 410-metre-deep pit with an additional optional 600-metre-deep pit being the deepest the company could go due to its aging fleet.

The partnership with Beifang Namibia will allow Rössing Uranium to commence Phase 4 of operations, which will be fully operational in 2027, with operations carried out by Beifang. 

In May, Rössing Uranium announced a life-of-mine extension for Namibia’s longest-running uranium mine by ten years, from 2026 to 2036, following the completion of their bankable feasibility study. 

The mine has been in operation since 1976 and has been mining on phase 2 and phase 3 pits, which will be completed in 2026.

author avatar
editor
See Full Bio
Share282Tweet176

Related Posts

Large mound of light gravel or sand in a desert, with a red conveyor belt depositing material atop the pile.
Mining

Elspe Mining produces 39,068 tonnes of gypsum in 2025

  Elspe Mining produced 39,068 tonnes of gypsum in 2025, maintaining stable supply to Namibia’s cement industry despite minor machinery-related...

May 16, 2026
Cluster of metallic cubic pyrite crystals on a rocky matrix with shiny, reflective facets against a dark background.
Mining

Kendrick targets world-class rare earth mine with new Teufelskuppe drilling results

  Kendrick Resources says new drilling results from its Teufelskuppe project have strengthened the potential for developing one of Namibia’s...

May 15, 2026

Recommended

Germany studies Namibia’s green hydrogen economy and export potential

Germany studies Namibia’s green hydrogen economy and export potential

3 years ago
Wia Gold completes N$346M placement to accelerate Kokoseb Gold Project 

Wia Gold completes N$346M placement to accelerate Kokoseb Gold Project 

2 years ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.