No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
  • Login
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home
Mining

Otjikoto Mine in record gold production, N$258m CAPEX in Q3 2023

by admin
November 9, 2023
in Mining
Reading Time: 2 mins read
1.8k 56
A A

Canadian Mining Company B2Gold’s Otjikoto Mine exceeded expectations and produced 44,940 ounces of gold in the third quarter attributed to improved processed grades.

The improved grades were driven by high-grade ore extracted from the Wolfshag underground mine.

This brings the mine’s total output for the past nine months to 127,487 ounces, a significant increase from the 101,546 ounces reported last year during the same period. 

“Gold recovery remained consistently high, averaging 98.4%. The heart of the production came from the Wolfshag underground mine, maintaining a consistent pace throughout Q3, with an average of 1,259 tonnes per day mined at an impressive average grade of 5.55 g/t,” the gold miner’s third quarter report read. 

Capital expenditure for the third quarter of 2023 totalled N$256.9 million (US$13 million), of which N$177.8 million (US$9 million) was for deferred stripping in the Otjiwarongo pit and N$59,3 million (US$3 million) for Wolfshag underground mine development. 

In terms of cost management, the Mine also performed well with cash operating costs per gold ounce produced being lower than expected at N$15,511 ($785) ($744 per ounce gold sold) attributed to higher production and a weaker Namibia Dollar.

“Moreover, lower diesel fuel costs played a role in reducing cash operating costs, much to the delight of stakeholders,” the report reads.

All-in-sustaining costs for the same quarter were at N$23,277 ($1,178) per gold ounce sold.

“This was largely due to lower cash operating costs, a higher number of gold ounces sold, and a reduction in sustaining capital expenditures linked to deferred stripping and underground development,” the miner said.

Cash operating costs at Otjikoto are expected to fall within the range of N$10,769 ($545) to N$11,954 ($605), compared to the original guidance of N$11,658 ($590) to N$12,844 ($650) per ounce.

“Likewise, all-in sustaining costs are projected to be between N$18,772 ($950) and N$19,957 ($1,010) per ounce, significantly lower than the initial estimate of N$21,340 ($1,080) to N$22,526 ($1,140) per ounce.”

Open pit mining operations at Otjikoto Mine are set to gradually wind down by 2025, while processing operations are expected to continue until 2031, with the potential for an extension if the ongoing underground exploration program identifies additional mineral deposits.B2Gold targets to produce between 190,000 and 210,000 ounces of gold in 2023.

MUST READ

African American man in a dark suit and red tie speaks into a handheld microphone on a panel, gesturing with his hands.

Southern Africa urged to develop regional mineral processing hubs to cut beneficiation costs

November 13, 2026
5.8k
Two workers in hard hats and high‑visibility clothing operate near a drilling rig in a dusty red desert landscape.

Aldoro completes 866 metres of drilling at Namibian copper-gold project

November 11, 2026
5.8k
Aerial view of a large open-pit coal mine with dark earth, conveyor belts, and scattered buildings along a dirt road; ponds and hills in the background.

Namibia’s mining laws need reform to protect communal land rights, report finds

November 10, 2026
5.8k
Namibia map showing offshore licenses: Cooper, Guy, and Tamar blocks with logos and a legend for Eco and other licenses.

BP completes farm-out deal with Eco Atlantic for Namibia oil blocks

November 10, 2026
5.8k
Portrait of a man with short hair and stubble, wearing a dark blue shirt with a Tharisa logo, standing in a bright office setting.

Tharisa NSX listing broadens mining sector exposure for Namibian investors

November 9, 2026
5.8k
Businesspeople greet each other with a handshake outside the Atlantic Hotel lobby entrance.

Namibia saves Dangote investment but loses N$13bn shipyard project to bureaucracy

November 8, 2026
5.8k
Next Post
Chevron seeks ECC to advance Namibia exploration 

Chevron seeks ECC to advance Namibia exploration 

Dundee Tsumeb records N$536m in Q3 earnings 

Dundee Tsumeb records N$536m in Q3 earnings 

Recommended

RWE, Hyphen explore 300 000 t/y Namibia green ammonia offtake

RWE, Hyphen explore 300 000 t/y Namibia green ammonia offtake

Should Namibia’s pension savings be invested in mining private equity?

Should Namibia’s pension savings be invested in mining private equity?

Ithete to attend 2025 Namibia International Energy Conference

Ithete to attend 2025 Namibia International Energy Conference

Sintana upgrades Mopane oil resource to 1.38 billion barrels

Mining, oil and gas investment lifts Namibia’s FDI to N$11.4bn

New ECB board appointed

New ECB board appointed

Shell to spend quarter of exploration budget on Namibia exploration

Shell to spend quarter of exploration budget on Namibia exploration

Load More

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
  • Login
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.