• Mining
Saturday, January 31, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Energy

Osino explores mine development partnerships

by editor
September 26, 2023
in Energy, Gold, Mining
1.8k 93
A A
0

Osino Resources has announced plans to forge partnerships within the gold industry, specifically with the Otjikoto and Navachab mines, as it works towards the development of its Twin Hills gold project.

This comes as the Twin Hills gold project’s entrance into the front-end engineering and design (FEED) phase, a crucial milestone on its path to production.

The company’s President and CEO, Heye Daun underscored that Osino finds strong appeal in collaborating with an established player in the gold sector, given its relatively small market capitalisation.

“We’ve obviously spoken with a range of parties including the owners of Namibia’s two operating gold mines, Otjikoto and Navachab and something could come of these discussions. The bottom line though is that we are prepared to build the Twin Hills gold project ourselves. It is an amazing project which would pay for itself in little more than two years,” Daun told the Mining Review.

The project’s FEED phase comes after Osino and its consultants successfully completed a definitive feasibility study (DFS) that confirmed the highly positive findings of the preliminary feasibility study (PFS) released a year ago.

Lycopodium Minerals (Canada) has been selected to lead the FEED phase, building on its extensive experience in designing and constructing gold plants in Africa, particularly in West Africa.

Lycopodium’s responsibilities during the FEED phase encompass the design and engineering of the process plant, most site infrastructure, including the tailings storage facility, and the completion of earthworks design.

They will also advance the technical and commercial documentation of long lead items.

Osino Resources is set to play a significant role in the FEED phase, contributing directly to areas such as bulk power supply connection, renewable power supply plans, ground and surface water supply models and designs, and access road rerouting.

To bring the Twin Hills mining project to life, Osino Resources will need to invest N$6.8 billion (US$365 million), according to the recently released DFS results.

The company envisions production commencing by the end of 2025 or early 2026, with a projected mine life of 13 years and a processing capacity of five million tonnes per annum.

In a significant move last year, Osino Resources Corp acquired the Ondundu gold exploration property from B2Gold, with the latter receiving Osino Resources Corporation shares as part of the deal.

B2Gold had previously invested N$157.5 million in exploration expenditure between 2015 and 2021.

Situated within the Damara sedimentary mineral belt and in proximity to the Navachab and Otjikoto gold mines, the Twin Hills project holds great promise for the Namibian gold mining industry. Osino recently listed on the Namibian Stock Exchange. – The Brief/Mining Review 

 

 

 

author avatar
editor
See Full Bio
Share392Tweet245

Related Posts

Pancontinental identifies two new hydrocarbon prospects in Namibia’s Orange Basin
Energy

Pancontinental lifts PEL 87 resource estimate to 6.1bn barrels after new prospects identified

  Pancontinental Energy NL has increased the high-case prospective resource estimate for its offshore Namibian permit, PEL 87, to 6.1...

January 30, 2026
Bannerman switches Etango uranium project to live power
Energy

Bannerman invests over N$545m in Etango early works

  Bannerman Energy Ltd has completed approximately N$545.6 million (A$48.5 million) in early works at its Etango uranium project as...

January 29, 2026

Recommended

TotalEnergies wins stake in US$29bn Qatar gas project

TotalEnergies wins stake in US$29bn Qatar gas project

4 years ago
ReconAfrica commences exploration drilling on Naingopo Well

ReconAfrica commences exploration drilling on Naingopo Well

2 years ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2024 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2024 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.