• Mining
Thursday, September 3, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Mining

NamPower begins construction of N$630m line

by editor
August 2, 2021
in Mining
1.7k 129
A A
0

NamPower has commenced with the construction of the 287 km long 400 kV Auas-Gerus transmission line at a cost of N$630 million.

The line which is being constructed by Tsumeb based, Power Line Africa over an 18-month period, will run from Auas substation near Dordabis, to Gerus substation near Otjiwarongo.

The 287-kilometre Auas-Gerus 400 kV transmission line is part of NamPower’s investment in expanding its 400 kV transmission infrastructure backbone, by 833 kilometers at cost of N$3.5 billion.

The project when completed in the second half of 2022, according to NamPower, is expected allow the following:
1. To accommodate the energy needs for a growing population with everchanging needs, and an economy that is expected to show resilient return to growth.
2. To allow for evacuation of power from new generation projects, as planned by NamPower (Omburu Solar PV, Anixas Firm Power Project, Otjikoto Biomass, Lüderitz Wind and others) as well as the private sector – IPP’s through the Modified Single Buyer model.
3. To allow opportunities for energy trading with other utilities within the Southern African Power Pool, for NamPower as well as private sector energy players.

[iframe width=”560″ height=”315″ src=”https://www.youtube.com/embed/xON-qmCl2cE” frameborder=”0″ allowfullscreen ]
author avatar
editor
See Full Bio
Share393Tweet246

Related Posts

Man in a navy suit standing at a glossy black booth counter, smiling at camera, Andrada Mining backdrop behind him.
Mining

Andrada targets 50-70% tonnage increase as Namibia portfolio expands

  Andrada Mining is targeting a 50% to 70% increase in processing tonnage as it advances an ore sorting project...

September 3, 2026
Namibia’s mining renaissance: Building financial architecture for sustainable growth
Mining

Ore in the ground is a resource. Ore processed is an economy.

  By Kegan Strydom Every mining conversation in Namibia eventually arrives at the same aspiration: stop exporting rock, start exporting...

September 2, 2026

Recommended

TotalEnergies CEO in Namibia for talks with President

TotalEnergies CEO in Namibia for talks with President

1 year ago
Noronex confirms deeper copper zones at Fiesta project

Noronex completes Dordabis copper project sale, receives final N$5 million payment

6 months ago
Load More
Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.