• Mining
Thursday, June 18, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Mining

Lofdal Rare Earths Project valued at N$21.3 Billion

by reporter
December 5, 2025
in Mining
1.9k 20
A A
0
 

Namibia Critical Metals Inc. (NCMI) says the results from its Pre-Feasibility Study (PFS) for the Lofdal Heavy Rare Earths Project value the development at up to N$21.3 billion (US$1.25 billion) under its upside pricing scenario.

The company said this confirms Lofdal as one of the world’s few advanced dysprosium-, terbium- and yttrium-dominant deposits outside China.

Under the Base Case scenario, the project carries a pre-tax NPV of N$6.62 billion (US$389.2 million) and an after-tax NPV of N$4.69 billion (US$275.5 million).

The Divergent Case, reflecting prolonged export controls and higher ex-China pricing, shows a pre-tax NPV of N$21.17 billion (US$1.245 billion) and an after-tax NPV of N$12.72 billion (US$747.9 million).

The study indicates rapid capital recovery, with a payback period of 4.2 years under the Base Case and 2.75 years under the Divergent Case.

“Lofdal is well positioned as one of very few advanced major Dy/Tb- and Y projects outside China, with a supportive jurisdiction, a mining licence, fully environmentally permitted, an excellent relationship with the communities and a key strategic JV partner (JOGMEC),” said Darrin Campbell, President of Namibia Critical Metals.

Pre-production capital expenditure is estimated at N$4.65 billion (US$273.4 million), with total capital costs reaching N$5.91 billion (US$347.9 million). Operating costs over the life of mine are projected at N$28.6 billion (US$1.68 billion).

Under both pricing models, the project is expected to deliver strong early cash flow, with Base Case cumulative after-tax cash flow of N$8.73 billion (US$513.1 million) and Divergent Case cumulative after-tax cash flow of N$21.1 billion (US$1.24 billion).

The PFS confirms a 13-year mine life, supported by 32 million tonnes of Proven and Probable Reserves grading 0.176% TREO. Annual production is forecast at 1,478 tonnes of total rare earth oxides, including high-value dysprosium, terbium and yttrium, which are critical for electric vehicles, wind turbines, aerospace technology and advanced electronics.

The company said that Lofdal’s economics are strengthened by the global shift towards secure, non-Chinese supply sources of heavy rare earths, with export controls widening price differentials and increasing demand.

Yttrium, expected to form nearly half of Lofdal’s rare earth oxide basket, has experienced a European spot price surge of more than 4,000% in 2025, reinforcing the long-term market outlook.

“The Project’s economic case is now underpinned by three value pillars: Dy/Tb high-temperature magnet demand, Yttrium demand from aerospace, semiconductors and the turbine industry, and Nd/Pr magnet demand. This diversified critical material exposure increases the strategic attractiveness of Lofdal for OEMs and governments,” Campbell added.

Developed under a joint venture with the Japan Organization for Metals and Energy Security (JOGMEC), the fully permitted Lofdal project is strategically positioned to supply Japan and other markets. JOGMEC has invested more than C$10 million, securing a 40% stake in the development.

author avatar
reporter
See Full Bio
Share416Tweet260

Related Posts

Male presenter in a suit speaks at a clear podium on a lit stage; sign reads '2026 IES' and 'New Orleans' in the foreground.
Mining

Shakwa Nyambe hands over leadership of global energy negotiators association

  Namibian energy executive Shakwa Nyambe has stepped down as President of the Association of International Energy Negotiators (AIEN) after...

June 17, 2026
Namibia map highlighting Kaoko Metals projects: Chalkos Cu/Ag near Sesfontain and Karibib Cu/Au/WO3 near Walvis Bay, with Atlantic Ocean to the west.
Mining

Kaoko Metals moves closer to maiden drilling at Karibib Project

  Kaoko Metals is advancing exploration activities at its Karibib Project in central Namibia as it moves closer to launching...

June 16, 2026

Recommended

Skeleton Coast uranium exploration commences

Skeleton Coast uranium exploration commences

2 years ago
ReeXploration uncovers major uranium target at Namibia’s Eureka Project

ReeXploration secures funding for 2026 uranium drill programme in Namibia

5 months ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.