• Mining
Wednesday, July 15, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Tin

Andrada targets 60% increase in Uis throughput with ore sorting technology

by reporter
July 13, 2026
in Tin
1.8k 37
A A
0
 

Andrada Mining expects to increase processing throughput at its Uis Tin Mine in Namibia by about 60% through the introduction of ore sorting technology.

Speaking on a mining podcast, Chief Executive Officer Anthony Viljoen said the company has transformed Uis from a pilot operation into a commercial producer and is now focused on optimising plant performance through upgrades to the front-end processing circuit.

Viljoen said the introduction of X-ray Transmission (XRT) ore sorting technology will enable the company to separate high-grade mineralised ore from waste before material enters the processing plant, significantly improving feed quality.

“That basically upgrades your feed into the circuit by about two to three times. As I said, that gives you a lot more efficiency. It should increase our throughput by about 60%. Obviously, what that achieves is a dilution of fixed costs, so it makes everything a lot more profitable and a lot more efficient, without requiring a lot of additional infrastructure capacity,” he said.

Viljoen acknowledged that implementing the technology had taken longer than anticipated because parts of the processing plant had to be reconfigured to accommodate new crushing equipment. However, he said the company is now well positioned to benefit from the upgrade.

Beyond tin production, Andrada continues to expand its presence in the critical minerals sector through exploration of lithium, tungsten, copper and tantalum assets in Namibia.

At its Lithium Ridge project, drilling undertaken in partnership with global lithium producer SQM has confirmed extensive lithium mineralisation extending about six kilometres along strike and at depth.

“We entered into a partnership with SQM, the second-largest lithium miner globally. They’ve been conducting an extensive drilling programme at Lithium Ridge under our earn-in arrangement. We’ve drilled something like 16,500 metres to date, and it has basically confirmed everything we wanted it to confirm: high-grade mineralisation, long strike length and continuity at depth,” Viljoen said.

The company is also advancing work at its Brandberg West project, where drilling and metallurgical test work are planned to assess the scale of tin, tungsten and copper mineralisation and evaluate the project’s development potential.

Viljoen said Andrada’s immediate priorities are to increase cash generation at Uis, expand its mineral resource base and progress its portfolio of critical minerals projects.

“We’re hoping to build on that success and see what comes out of Brandberg West, and potentially add another two minerals to our portfolio of critical metals. There’s going to be a lot of news flow. We are at the cusp of a breakout, in my view, from the junior mining space into something more mature,” he said.

author avatar
reporter
See Full Bio
Share393Tweet246

Related Posts

Andrada Mining poised for earnings uplift as tin prices surge
Tin

Andrada tin output rises 15% to 1,740 tonnes as processing hits 1.04m tonnes

  Andrada Mining Limited’s tin concentrate production increased by 15% to 1,740 tonnes, with contained tin output rising by 11%...

March 26, 2026
Evolve Royalties acquires stake in Andrada’s Uis Tin Mine in N$520m deal
Tin

Evolve Royalties acquires stake in Andrada’s Uis Tin Mine in N$520m deal

  Canadian royalty and streaming company Evolve Royalties Ltd. has entered into a definitive agreement to acquire a sliding-scale gross...

February 25, 2026

Recommended

Wolfshag ore production on course – B2Gold

Wolfshag ore production on course – B2Gold

4 years ago
B2Gold’s Otjikoto Mine powered 79% by renewable energy

B2Gold’s Otjikoto Mine powered 79% by renewable energy

2 months ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.