
Andrada Mining has reported high-grade lithium mineralisation at its Lithium Ridge project in Namibia’s Erongo Region, following the completion of a N$133 million (US$7 million) exploration programme funded by SQM International.
The company said the final drilling results confirmed lithium-bearing pegmatites extending to depths approaching 300 metres, strengthening the project’s potential for future lithium production.
The results conclude the first stage of exploration at Lithium Ridge, located approximately 35 kilometres southeast of Andrada’s Uis Mine.
Andrada completed 143 diamond drill holes totalling 16,525 metres, exceeding the original 14,000-metre programme by 18%.
Among the significant results, one drill hole intersected 15.94 metres grading 2.20% lithium oxide, including a higher-grade section of 2.96 metres at 3.07%.
Another hole returned 32.07 metres grading 1.02% lithium oxide, while a deeper intersection recorded 24.17 metres at 1.30%. The reported intersections represent apparent widths measured along the drill holes.
Andrada Chief Executive Officer Anthony Viljoen said the drilling had established the scale and continuity of a mineralised pegmatite system extending approximately nine kilometres along strike.
“The release of the final batch of Stage 1 drill results marks a defining milestone for the Lithium Ridge project and our strategic partnership with SQM. Across 143 diamond drill holes comprising over 16,500 metres of core, our exploration team has been able to demonstrate the scale, grade, and structural continuity of a mineralised pegmatite system that extends for some 9km along strike.
“These final assays close out the drilling campaign on a high note delivering shallow, high-grade lithium intersections, while simultaneously proving that wide, well-mineralised pegmatites, some exceeding 30 metres in apparent width, persist to depths approaching 300 metres,” Viljoen said.
The company said several drill holes intersected multiple lithium-bearing pegmatite layers, indicating potential for open-pit mining in shallower sections of the deposit.
The mineralised system also remains open at depth, suggesting scope for further exploration.
In addition to lithium, the drilling confirmed tin and tantalum mineralisation across the licence area, presenting opportunities for potential multi-commodity production.
“Equally compelling is the persistent tin and tantalum mineralisation across the licence. Leveraging Andrada’s established operational and metallurgical expertise from our nearby Uis Mine, the potential to produce multiple critical minerals from a single operation could significantly enhance future project economics,” Viljoen said.
Andrada said the presence of multiple minerals could improve the project’s commercial prospects, although further metallurgical testing and economic assessments would be required to determine its development potential.
The exploration programme was funded by SQM International under a three-stage earn-in agreement with Andrada.
Under the arrangement, SQM is funding the initial US$7 million exploration expenditure to secure an initial 30% interest in Grace Simba Investments, the company holding the Lithium Ridge project.
The completion of the first-stage drilling programme marks a key step in evaluating the project’s mineral potential ahead of further exploration and development decisions.











