• Mining
Tuesday, November 10, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Uranium

IAEA raises groundwater protection concerns over Namibia uranium pilot project

by reporter
November 9, 2026
in Uranium
1.8k 37
A A
0

 

Group of professionals in business attire gather outside a modern white building with the IAEA logo on the wall and a red carpet under a bright blue sky.
 

The International Atomic Energy Agency (IAEA) has raised concerns over insufficient scientific evidence to demonstrate groundwater protection at the proposed Wings uranium project in Namibia’s Omaheke Region, identifying 27 areas requiring improvement before pilot in-situ leaching (ISL) operations proceed.

The findings are contained in an independent technical review of the project being developed by Headspring Investments, a subsidiary of Uranium One Group, which falls under Russia’s state-owned nuclear corporation Rosatom.

According to the IAEA, the developer has not provided sufficient scientific evidence to demonstrate effective separation between the uranium-bearing Auob Aquifer and the overlying Kalahari Aquifer, raising concerns about groundwater protection during the proposed pilot operations.

The agency recommended additional testing and verification of environmental safeguards before chemical leaching solutions are introduced into the uranium-bearing aquifer.

The review identified 27 areas for improvement, comprising 20 technical recommendations and seven relating to stakeholder engagement and regulatory coordination.

“Twenty-seven suggestions – seven relating to stakeholder engagement (S.1–S.7) and twenty relating to technical aspects of ISL operations (T.1–T.20) to address issues and to support safe and environmentally responsible in-situ leaching,” the report states.

The IAEA proposed a phased authorisation process that would require the developer to demonstrate compliance with environmental and technical safeguards before progressing to subsequent stages of the pilot project.

The agency also identified shortcomings in radioactive waste management, noting that Namibia currently does not have an established disposal facility for radioactive waste generated by ISL pilot operations.

According to the report, Headspring intends to store radioactive residues at the project site until an appropriate disposal facility becomes available.

“Namibia currently does not have an established facility for the disposal of radioactive waste from ISL pilot operations. As a result, the Proponent intends to store radioactive residues on site until a suitable disposal option becomes available,” the report states.

“It should be noted that, the absence of a confirmed disposal option introduces uncertainty regarding long-term handling and off-site transfer of radioactive materials.”

The agency further found that while the project’s Environmental Management Plans outline general waste management measures, detailed site-specific procedures were not available for assessment.

It attributed some of the shortcomings to the project’s early development stage, as laboratory facilities remain incomplete and pilot operations have yet to commence.

The IAEA recommended that the developer assess the radioactivity of drilling residues to determine whether they should be classified as radioactive waste and whether they qualify for exemption from disposal requirements.

The review also called for improvements in radiation protection measures, including facility design, sample handling, contamination controls, monitoring procedures and the inclusion of radon and radon progeny monitoring.

“The Proponent’s radiation protection documentation identifies several controls and monitoring elements, however, some refinements are identified to align with international standards,” the report states.

The agency emphasised that its assessment applies only to the proposed pilot operations and does not constitute a recommendation to approve or reject the project.

It said the final decision on authorisation remains the responsibility of Namibian authorities.

author avatar
reporter
See Full Bio
Share393Tweet246

Related Posts

Industrial drilling rig captured from ground level, showing metal rails, gears and hydraulic components reaching toward the sky.
Uranium

Arkle begins second-phase drilling at Namibia’s Onyofi uranium project

  London-listed Arkle Resources PLC has commenced the second phase of drilling at its Onyofi Uranium Project in Namibia’s Erongo...

November 10, 2026
Langer Heinrich Mine records 33% rise in uranium production
Uranium

Langer Heinrich uranium mine generates N$1.52bn in quarterly revenue

  Paladin Energy’s Langer Heinrich uranium mine in Namibia generated N$1.52 billion (US$92.4 million) in revenue during the quarter ended...

November 6, 2026

Recommended

Helix Energy Solutions’ Q7000 rig arrives in Namibia ahead of Brazil assignment

Helix Energy Solutions’ Q7000 rig arrives in Namibia ahead of Brazil assignment

2 years ago
Panelist in a green shawl and colorful headwrap speaks into a handheld microphone, holding papers.

Namibia to develop oil, gas and green energy in parallel

2 months ago
Load More
Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.