• Mining
Saturday, November 7, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Uranium

Elevate Uranium achieves 79% recovery at Marenica pilot plant

by reporter
August 31, 2026
in Uranium
1.8k 19
A A
0

 

 

Elevate Uranium has achieved a 79% uranium recovery rate from the first four stages of its U-pgrade™ pilot plant at the Marenica Uranium Project in Namibia, as the company advances testing of its proprietary beneficiation process.

The company said the first four stages of the five-stage pilot plant rejected about 88% of the original ore mass while increasing the uranium grade from 89 parts per million (ppm) to 590 ppm.

The results represent a seven-fold increase in uranium grade and are broadly in line with the design basis and historical bench-scale testing undertaken in 2013.

Elevate Uranium Managing Director Murray Hill said all five stages of the pilot plant are now operating on ore from Marenica, with optimisation work continuing across the circuit.

“All five stages of the pilot plant are now operating on ore from Elevate’s Marenica Uranium Project. The pilot plant is rejecting 88% of the ore mass and thereby upgrading the ore from 89 ppm to 590 ppm, before it reaches the final concentration stage, which is in line with historical bench-scale results,” Hill said.

He said the seven-fold upgrade achieved through stages one to four was consistent with historical testing, which subsequently achieved a further six- to eight-fold increase in uranium grade during the fifth stage.

The fourth stage of the pilot process, which involves calcite flotation, has also successfully removed carbonate minerals that would otherwise increase acid consumption during uranium leaching.

According to Elevate, removing calcite allows the upgraded material to undergo a simpler acid-leaching process at ambient temperature over four to six hours, potentially reducing the size, energy requirements and operating costs of a conventional leach plant.

“By removing the calcite, U-pgrade™ produces a feed that can be simply leached in acid at ambient temperature in four to six hours,” Hill said.

“That single outcome fundamentally changes the size, energy demands, operability and operating costs of a leach plant utilising the U-pgrade™ process, which is a major structural advantage we have regardless of the final concentrate grade.”

The company said the fifth and final stage, uranium flotation, remains under optimisation.

Historical bench-scale testing showed that the stage could deliver a further six- to eight-fold increase in uranium grade, potentially producing a final concentrate of approximately 4,240 ppm uranium, equivalent to about 5,000 ppm U₃O₈.

Results from optimisation of the final stage are expected during the fourth quarter of 2026.

Elevate said pilot plant availability and operational performance have also improved as freight and delivery constraints eased following an increase in inventories of spare parts and reagents.

Data generated from the pilot plant programme will be used to support a planned Scoping Study for the Marenica Uranium Project.

“Our team remains focused on continued circuit optimisation across all five stages, including uranium flotation, and we will report improvements as they are confirmed. The data generated from this programme will be used to support a Marenica Scoping Study,” Hill said.

author avatar
reporter
See Full Bio
Share394Tweet246

Related Posts

Langer Heinrich Mine records 33% rise in uranium production
Uranium

Langer Heinrich uranium mine generates N$1.52bn in quarterly revenue

  Paladin Energy’s Langer Heinrich uranium mine in Namibia generated N$1.52 billion (US$92.4 million) in revenue during the quarter ended...

November 6, 2026
Map showing Skeleton Coast uranium projects with mines (Rössing, Husab, Bannerman, Langer Heinrich) and EPL blocks EPL8617, EPL9873, EPL9727, EPL8208, EPL9872; Swakopmund and Walvis Bay Port labeled.
Uranium

Skeleton Coast Uranium raises N$40.8m to advance exploration in Namibia

    Canadian-listed Skeleton Coast Uranium Corp. has raised approximately N$40.8 million (C$2.33 million) through the first tranche of a...

November 6, 2026

Recommended

Debmarine’s Benguela Gem wins top awards

Debmarine’s Benguela Gem wins top awards

4 years ago
Over N$3.5 billion spent on skills and CSR by Namibian mining sector

Over N$3.5 billion spent on skills and CSR by Namibian mining sector

1 year ago
Load More
Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.