• Mining
Thursday, April 16, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Uranium

Deep Yellow initiates ore reserve upgrade drilling at Tumas 3

by editor
February 6, 2024
in Uranium
16 9
A A
0

Deep Yellow Limited is set to embark on the ore reserve upgrade drilling initiative at its flagship Tumas project.

The uranium developer’s Managing Director and CEO, John Borshoff, said the drilling is set to commence in late February.

He said the drilling aims to establish a robust reserve base within the Tumas 3 deposit, laying the groundwork for sustained mining operations over the next seven years.

“Deep Yellow is pleased to announce an ore reserve upgrade drilling program is scheduled to commence at the Tumas 3 deposit on 21 February 2024,” Borshoff said.

He said the project involves a substantial effort, with 13,000 meters of RC drilling and 350 meters of diamond core drilling slated to unfold.

“The primary objective of this initiative is to augment drill spacing across targeted zones within the Tumas 3 deposit, thereby facilitating the conversion of a portion of the existing 67.3 million pounds of probable reserves into a proven status under the JORC mineral resource code,” Borshoff said.

The CEO highlighted the importance of this upgrade, highlighting its pivotal role in delineating sufficient proven mineral reserves to sustain the initial seven years of mining operations and to initiate detailed mine scheduling.

“Tumas 3, nestled within EPL3496 in Namibia, represents a cornerstone asset for Deep Yellow Limited,” Borshoff said.

He noted that its location along the Tumas palaeodrainage, coupled with adjacent deposits such as Tumas 1, 1 East, Tumas 2, and Tubas, contributes to a formidable resource base, boasting substantial uranium resources.

“The forthcoming drilling campaign holds promise for Deep Yellow Limited’s operational expansion,” Borshoff said.

He anticipates assay results by April, with the company aiming to unveil an updated ore reserve status for Tumas 3 in July 2024.

The Tumas project is expected to cost N$6 billion (US$360.5 million) according to re-costing study findings from N$7.3 billion (US$385.1 million) projected from the definitive feasibility study.

The re-costing study’s findings show that this will result in cost savings of N$458 million (US$24.6 million).

This comes as the Chamber of Mines welcomed the material recovery in the uranium price, which has breached the US$100/lb mark and is currently trading at US$106/lb, a price move that market analysts have been predicting since 2013.

author avatar
editor
See Full Bio
Share200Tweet125

Related Posts

ReeXploration uncovers major uranium target at Namibia’s Eureka Project
Uranium

ReeXploration reports strong uranium indicators in maiden drilling at Eureka project

  ReeXploration Inc. has reported encouraging preliminary results from its maiden uranium drilling programme at the Eureka Project in central...

April 10, 2026
Elevate Uranium ships pilot plant to Namibia, expands drilling at Koppies
Uranium

Elevate Uranium sets August 2026 target for pilot plant results

  Elevate Uranium Limited has set August 2026 as the target for releasing results from its U-pgrade™ pilot plant in...

April 9, 2026

Recommended

Zhero unveils 500,000 tonnes green ammonia project near Walvis Bay

Zhero unveils 500,000 tonnes green ammonia project near Walvis Bay

2 years ago
Boris Johnson announces R8 billion green partnership with Bill Gates

Boris Johnson announces R8 billion green partnership with Bill Gates

4 years ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.