• Mining
Sunday, October 19, 2025
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Energy

NamPower is not broke – Haulofu

by editor
May 16, 2023
in Energy, Mining
1.8k 93
A A
0

NamPower says its sustainability is not dependent on the current pursuit to recover N$1.5 billion owed by clients.

The national utility’s Managing Director Kahenge Simson Haulofu shrugged off notions that NamPower is cash-strapped. 

Haulofu said the power utility’s engineered debt recovery was not due to the persistent load-shedding in South Africa where NamPower imports 100 megawatts (MW).

 “…this is just a normal procedure which we also undertook in 2021 to collect what belongs to us, as we need such funds to be reinvested and finance our business operations. This does not mean, NamPower is broke, we are not broke and remain sustainable,” he said.

“We just need what is ours, because there is no way one expects us to continue providing electricity to clients for free, and also we need to use such funds to transact our electricity supplement we source from SADC pool, Zambia or Zimbabwe.”

Namibia imports 100MW from Eskom, 180MW from Zambia’s Zesco and 80MW from Zimbabwe. Meanwhile, the electricity demand for Namibia stands at 670MW.

Haulofu is adamant that NamPower has not failed in any way in recouping debts. This is after the Electricity Control Board (ECB) last week raised concern that the country’s power utility has not been diligent with debt management and general revenue collection.

“We have not failed in any way. We have engaged clients in the least manner to find an amicable solution. Our policies are clear and this what we are doing is in accordance with the agreements entered into,” the MD said. 

“NamPower further offered to waive interest charges on overdue accounts settled within a 12-month period, as well as to increase the payment terms of all customers from 14 days to 20 days from the date of invoice. With the re-introduction of the Debt Collection Plan, we are offering the same again, and in addition, an incentive to write off the interest portion of the outstanding debt accumulated over the preceding 12 months. The total interest being waivered is N$74 million,” Haulofu added.

Haulofu has promised the nation that NamPower has the capability to supply electricity without any interruption and will continue to do so.

“We have been powering this country without fail, and we are still capable, thus we shall continue doing so. As it stands, we have not been informed by any of our supplement power suppliers of any possible interruption. In the case of South Africa, when it does load shedding, we are also shedded, and this is not something new, as it has been part of the bilateral agreement. We have the capability, and when something of that nature happens, you will hear the engines running as our power stations (back-up) across the nation,” he assured. 

His statement concurs with ECB’s that the nation is guaranteed of lights shining bright for a 12-month period without failure or fear.

author avatar
editor
See Full Bio
Share392Tweet245

Related Posts

Golden Deeps raises N$39 million to fast-track Otavi exploration
Mining

Golden Deeps raises N$39 million to fast-track Otavi exploration

  Golden Deeps Limited has raised N$39 million (A$3.54 million) through an oversubscribed capital placement, providing a significant boost to...

October 17, 2025
Bannerman nears Final Investment Decision on Etango Uranium Project
Energy

Bannerman appoints Windhoek Consulting Engineers to lead design of Walvis Bay project

  Bannerman Energy Ltd has appointed Windhoek Consulting Engineers, a Namibian engineering consultancy, to lead the detailed design and construction...

October 17, 2025

Recommended

ANIREP, IFC conduct feasibility study for 10-20MW solar power plant

ANIREP, IFC conduct feasibility study for 10-20MW solar power plant

3 years ago
Golden Deeps unveils high-grade gallium discovery at Nosib Prospect

Golden Deeps unveils high-grade gallium discovery at Nosib Prospect

6 months ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2024 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2024 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.