• Mining
Friday, July 24, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Copper

CCC generates N$1.35bn from Tschudi, targets full mining by Q1 2027

by reporter
March 23, 2026
in Copper
1.8k 56
A A
0
 

Consolidated Copper Corporation (CCC) says it has generated approximately N$1.35 billion (US$80 million) from residual copper sales since the recommissioning of its Tschudi Mine in August 2024.

CCC Chief Executive Officer John Sisay told Namibia Mining & Energy that the funds have been strategically reinvested into extensive drilling programmes and technical studies.

“To brief you on the work done in that regard: we have completed roughly US$80 million worth of copper sales using that residual supply. Those funds were reinvested into the company for necessary studies, extensive drilling and a pre-feasibility study (PFS),” he said.

Sisay said the company is targeting the commencement of full-scale mining operations at Tschudi by the first quarter of 2027.

Intensive drilling has expanded the project’s resource base by approximately 30 million tonnes, bringing the total to around 80 million tonnes. This has extended the mine’s projected life from about three years to between 12 and 15 years.

While the mine is currently producing from residual copper heaps, CCC is conducting a PFS to optimise extraction. The company is evaluating an increase in recovery rates from the current 65% to as much as 93% through the introduction of a flotation plant.

“We now have a much clearer understanding of the different copper types. Through the drilling programme, we know we can produce oxides, leading to cathode production, for at least another six to seven years, and we are looking at a 12 to 15-year mine life overall for Tschudi,” Sisay told Namibia Mining & Energy.

The company’s longer-term objective is to reach the plant’s nameplate production capacity of 17,000 tonnes per year. To support this transition, CCC is recruiting mining engineers and a mines manager as it moves from processing to active extraction.

Sisay said approximately 75% of Phase 1 capital expenditure was spent locally, a move aimed at reducing foreign exchange exposure and strengthening the company’s operating position.

“We have about 90 people on site. We are currently looking for a mines manager. We have focused on processing over the past two years, but as we move into the next phase of active mining, we are recruiting mining engineers. We also have a new Chief Operating Officer and a strong team in place,” he said.

Consolidated Copper Corporation successfully restarted the Tschudi copper plant in Namibia in 2024, producing LME Grade A copper cathode.

Constructed in 2015, the Tschudi plant is Namibia’s only LME-grade refined copper processing facility. It previously produced more than 80 kilotonnes of LME Grade A copper cathode annually before being placed on care and maintenance in 2020

author avatar
reporter
See Full Bio
Share401Tweet251

Related Posts

Namibia map highlighting two mining projects: Chalkos Cu/Ag near Sesfontain and Karibib Cu/Au/WO3 near Walvis Bay.
Copper

Kaoko Metals confirms high-grade copper, gold and tungsten at Karibib Project

  ASX-listed explorer Kaoko Metals Limited has reported strong assay results from its initial reconnaissance rock-chip sampling programme at the...

July 16, 2026
Midas reports up to 2.39% copper and 47.8g/t silver at Otavi project
Copper

Midas expands Namibia copper discovery to 800m strike length

  ASX-listed explorer Midas Minerals Ltd has announced the expansion of its Spaatz Prospect in Namibia, extending the core copper-silver...

July 6, 2026

Recommended

Koryx Copper deploys extra rigs to boost drilling at Haib Project

Koryx Copper upgrades Haib resource to 3.5Mt as grades and mine life improve

4 months ago
Byrnecut clinches N$1.6bn B2Gold mine development contract

Byrnecut clinches N$1.6bn B2Gold mine development contract

4 years ago
Load More

Newsletter

Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.