• Mining
Saturday, September 5, 2026
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
Subscribe
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPERREADER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc
No Result
View All Result
Mining and Energy Namibia | Namibia’s Leading Mining & Energy News
No Result
View All Result
Home Copper

Koryx completes PEA as Haib drilling defines higher-grade targets

by reporter
August 28, 2025
in Copper
1.8k 19
A A
0
 

Koryx Copper Inc has completed a Preliminary Economic Assessment (PEA) for its wholly owned Haib Copper Project in southern Namibia as part of its mining licence application.

The company said an updated PEA, scheduled for publication in September 2025, reflects progress in metallurgical test work, process flowsheet development and infrastructure trade-offs.

It remains based on the existing mineral resource estimate of 23 October 2024 and does not include recent drilling results.

Reporting on the current campaign, Koryx released assay results from seven drill holes totalling 2,986 metres across its Phase 2, 3 and 4 programme, which forms part of the company’s 2025 exploration and project development strategy to improve understanding of copper, molybdenum and gold mineralisation and to identify higher-grade zones.

President and CEO Heye Daun said the tighter, deeper drilling approach is delivering encouraging extensions.

“Our strategy of drilling close spaced and deeper holes is paying dividends as we are seeing mineralization extending down dip and along strike into areas previously classified as waste,” he said.

Daun added that increasing drill density is sharpening the geological model and lowering project risk.

“Already, our geologists are better able to identify correlation between copper grades and geology, which allows us to better plan drill locations, as we seek to identify higher grade zones and de-risk the project. This increased drill density should assist in a much improved and tighter geological interpretation with the next mineral resource update,” he said.

Looking ahead, Daun said the development concept remains a conventional crush-mill-float operation.

“The potential improvement in mineral resources together with the conventional mill/float metallurgical flowsheet should further transform the Haib project into a robust, low risk, long life, world-class open pit copper development project with serious scale potential,” he said.

Koryx expects to complete its infill and expansion drilling, followed by geological modelling and mine planning, in the first half of 2026.

An updated Mineral Resource Estimate and a PFS-level technical study are planned for the second half of 2026.

author avatar
reporter
See Full Bio
Share395Tweet247

Related Posts

Rock with a greenish turquoise mineral vein and a black hammer resting on top, outdoors among red-brown boulders.
Copper

Koryx hits longest mineralised intersection at Haib as resource update nears

  Koryx Copper has reported its longest continuously mineralised intersection to date at the Haib Copper Project in southern Namibia,...

August 27, 2026
Mining Site
Copper

Midas targets Q1 2027 resource estimates for Spaatzu, Deblin and T-13

  Midas Minerals Ltd is targeting the first quarter of 2027 for initial mineral resource estimates at its Spaatzu and...

August 18, 2026

Recommended

Wia Gold secure N$341m to fund Kokoseb feasibility and expansion

Wia Gold raises N$1.1 billion to accelerate Namibia’s Kokoseb Gold Project

4 months ago
B2Gold invests N$88.85m in Otjikoto Mine expansion in Q2

B2Gold plans N$915 million capital spend in Namibia for 2026

7 months ago
Load More
Black transparent logo for dark mode

About Us

The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors

Categories

  • Copper
  • Diamonds
  • Energy
  • Gold
  • Green Hydrogen
  • Lithium
  • Mining
  • Namibia
  • News
  • Oil & Gas
  • Opinions
  • Tin
  • Uranium
  • Zinc

Get in touch

Email:newsdesk@miningandenergy.com.na

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Diamonds
  • Oil & Gas
  • Uranium
  • Green Hydrogen
  • E-PAPER
  • Gold
  • Lithium
  • Energy
  • Copper
  • Zinc

© 2026 Mining and Energy | All Rights Reserved. The Namibia Mining and Energy website is a comprehensive online platform dedicated to showcasing Namibia's mining and energy sectors.